Ellis Air Connect

Central Energy at 80 Ann Street

With the central Energy plant all but complete, its now time for our site teams to kick it into action. We are proud to join Mirvac in delivery of this premium addition to the Brisbane CBD. 80 Ann has been collaboratively designed, offering superior connectivity and ‘breathable’ spaces for improved wellness and focus. The approach […]

BIM in Energy Management

Building Information Modelling, (BIM), using a central collection of databases, is now being used more than ever during the early design and construction of buildings. It essentially means that every single asset, and it’s design and starting operational data is captured into an easy to access format. Ellis Air has been a long time adopter […]

Queens Wharf Central Energy Plant

A new world-class integrated resort development is being constructed that will put Brisbane on the map as a tourism, leisure and entertainment destination. Expected to open in 2022, Queen’s Wharf Brisbane will transform the CBD and river’s edge with an iconic design that embraces Brisbane’s inviting subtropical climate and celebrates the precinct’s Indigenous and European […]